Menard completed a ground improvement project for a new 3-story Light-Frame Residential and Dormitory (LFRD) school building using Controlled Modulus Columns (CMC)
Malaysia | Sepang Circuit
tazkiyachaerani2025-05-08T14:43:02+07:00Menard Asia completed the ground improvement using Prefabricated Vertical Drain (PVD) for the Driving Experience Center at Sepang Circuit, Selangor, Malaysia, ensuring stable construction on soft ground.
Malaysia | Cameron Highland
tazkiyachaerani2025-05-08T14:44:47+07:00Menard Asia has completed a ground improvement project in Ringlet, Cameron Highlands. The project addressed the soft ground condition, which was anticipated due to the area's history as a former sediment dump from the adjacent site.
Malaysia | Desa Park City
tazkiyachaerani2025-05-08T14:45:14+07:00Dynamic Compaction Installation on uncontrolled backfill by Menard enables a more economical foundation system for residential construction.
Malaysia | Residential Development Area
tazkiyachaerani2025-05-08T14:45:19+07:00The project is a platform construction of two storey housing within the residential development area. The platform is designed to be approximately at 1.3 m above the existing ground level (EGL).
Malaysia | Single Storey Factory in Selangor
tazkiyachaerani2025-05-08T14:54:17+07:00Prefabricated Vertical Drain (PVD) has been installed by Menard to accelerate the consolidation of the compressible soils for the construction of a single storey factory in Selangor.
Malaysia | Sapangar Bay Container Port
coralielaval2025-05-08T14:48:38+07:00Menard Asia completed the ground improvement for Container Port at Sapangar Bay with Prefabricated Vertical Drain in Malaysia
Malaysia | Bandar Universiti Pagoh
Menard Asia - Admin2025-05-08T14:49:01+07:00Menard Asia’s solution in Johor, Malaysia was using the Prefabricated Vertical Drain technique to treat the area for B15 and B16 Road of Bandar Universiti Pagoh.
Malaysia | Serendah Industrial Complex
Menard Asia - Admin2025-05-08T14:49:35+07:00Menard Asia has completed ground improvement using Dynamic Compaction and Dynamic Replacement for the construction of an industrial complex at Selangor.