Menard Cambodia successfully implemented ground improvement works using Controlled Modulus Columns (CMC) for the construction of a data center building in Phnom Penh..
Indonesia | MMP Cracks Rectification – CMC
tazkiyachaerani2025-05-08T14:42:15+07:00Discover how Menard Indonesia used Controlled Modulus Columns (CMC) to rectify soil cracks and stabilize a nickel smelter facility in Balikpapan.
Indonesia | VVIP Airport, Capital City of Nusantara (IKN)
tazkiyachaerani2025-05-08T14:42:27+07:00Menard Asia has completed the ground improvement for the VVIP Airport Project with PVD and CMC in Indonesia
Indonesia | Kiantar Airport, Poto Tano
tazkiyachaerani2025-05-08T14:55:44+07:00Menard reinforced the soft soils beneath the runway extension at Rendani Airport in Indonesia with Controlled Modulus Column (KGM) to improve stability and support for aircraft loads.
Vietnam | Ia Bang 1 Wind Power Project
tazkiyachaerani2025-05-08T14:45:04+07:00Menard’s solution allows to comply with the design criteria in terms of SLS bearing capacity, dynamic deformation modulus, and subgrade reaction coefficient, for the 12 turbines.
Cambodia | New Chroy Changvar Bridge – CMC
Menard Asia - Admin2025-05-08T14:47:35+07:00Facing challenging ground conditions, Menard implemented CMC which not only replaced the initially planned RC ground slab but also integrated with a Reinforced Earth Wall.
Cambodia | Private Villa Elite Town
tazkiyachaerani2025-05-08T14:47:31+07:00A villa with a basement and four floors is being built. While the initial plan suggested Bored Piles, Menard's solution used CMC for ground improvement, a tangent pile retaining wall system, and managed pit excavation. Completed in 3 weeks, we optimized time and costs for our client.
Cambodia | Zuellig Pharma Warehouse – CMC
tazkiyachaerani2025-05-08T14:54:04+07:00Faced with challenging ground conditions, Menard employed Controlled Modulus Columns (CMC) instead of traditional methods, ensuring cost-effective and timely solutions. This project marks the first CMC application under a building in Cambodia.
Cambodia | National Road 5 – Russey Keo Flyover – CMC
tazkiyachaerani2025-05-08T14:52:33+07:00Menard Cambodia implemented CMC which replaced RC piles and ground slab by a sandy load transfer platform, allowing costs and time saving to our client.
Indonesia | Serang Panimbang Toll Road Phase III
tazkiyachaerani2025-05-08T14:52:39+07:00Menard Asia has completed the ground improvement for the Serang - Panimbang Toll Road Project with Controlled Modulus Column in Indonesia