Menard Asia applied Controlled Modulus Columns to support 5 turbine foundations at Truong Son Wind Power Plant, Laos—meeting strict design criteria in hard clay and weathered rock conditions. CONTACT US Project OverviewThe Truong Son Wind Power Plant is one of the largest onshore wind energy projects in Laos. With a [...]
Philippines | Kalayaan 2 Wind Power Project
irfan2025-06-02T15:35:49+07:00Menard Asia used Controlled Modulus Columns to support 3 wind turbines in Kalayaan, Philippines—cutting cost and time while meeting performance goals on challenging hilltop terrain. CONTACT US Project Overview The Kalayaan 2 Wind Power Project supports the Philippines’ transition to clean energy. This renewable energy development required the [...]

Cambodia | Bakheng Water Production Facilities at Phase 3
tazkiyachaerani2025-05-08T14:39:20+07:00Menard completed a ground improvement project for a new 3-story Light-Frame Residential and Dormitory (LFRD) school building using Controlled Modulus Columns (CMC)
Bangladesh | Soil Stabilization at Central Control Room for Nuclear Power Plants – DSM
tazkiyachaerani2025-05-08T14:41:59+07:00Menard completed a critical ground improvement project using Deep Soil Mixing at a nuclear power plant in Bangladesh. This technique stabilized silty sand conditions, ensuring the foundation’s strength and resilience against seismic activity.
Bangladesh | Physical Protection System of Main & Auxiliary Facilities for Nuclear Power Plants – DSM
tazkiyachaerani2025-05-08T14:42:07+07:00Discover how Menard used Deep Soil Mixing to improve soil stability and prevent liquefaction in silty sand conditions at a nuclear power plant in Bangladesh.
Bangladesh | Nuclear Power Plant – DSM
tazkiyachaerani2025-05-08T14:42:31+07:00Deep Soil Mixing project in Bangladesh for a Nuclear Power Plant in Ruppur.
Vietnam | Ca Mau Power Plant Phase 1 & 2
tazkiyachaerani2025-05-08T14:44:59+07:00Menard Vacuum™ process ensured drastic reduction of the necessary amount of sand fill and especially the consolidation time (6 months instead of 14).
Vietnam | Ia Bang 1 Wind Power Project
tazkiyachaerani2025-05-08T14:45:04+07:00Menard’s solution allows to comply with the design criteria in terms of SLS bearing capacity, dynamic deformation modulus, and subgrade reaction coefficient, for the 12 turbines.
Bangladesh | LPG Terminal Extension area for 3x4000m³ Mounded Tanks facility – PVD
tazkiyachaerani2025-05-08T14:45:36+07:00This project is the first PVD job for Menard in Bangladesh.
Cambodia | Riverbank Stabilization – Deep Soil Mixing (DSM)
tazkiyachaerani2025-05-08T14:47:41+07:00Menard Cambodia utililsed Deep Soil Mixing (DSM) to prevent slope failure at the intake site.