Menard Cambodia successfully implemented ground improvement works using Controlled Modulus Columns (CMC) for the construction of a data center building in Phnom Penh..
Bangladesh | Soil Stabilization at Central Control Room for Nuclear Power Plants – DSM
tazkiyachaerani2025-05-08T14:41:59+07:00Menard completed a critical ground improvement project using Deep Soil Mixing at a nuclear power plant in Bangladesh. This technique stabilized silty sand conditions, ensuring the foundation’s strength and resilience against seismic activity.
Bangladesh | Physical Protection System of Main & Auxiliary Facilities for Nuclear Power Plants – DSM
tazkiyachaerani2025-05-08T14:42:07+07:00Discover how Menard used Deep Soil Mixing to improve soil stability and prevent liquefaction in silty sand conditions at a nuclear power plant in Bangladesh.
Indonesia | MMP Cracks Rectification – CMC
tazkiyachaerani2025-05-08T14:42:15+07:00Discover how Menard Indonesia used Controlled Modulus Columns (CMC) to rectify soil cracks and stabilize a nickel smelter facility in Balikpapan.
Indonesia | VVIP Airport, Capital City of Nusantara (IKN)
tazkiyachaerani2025-05-08T14:42:27+07:00Menard Asia has completed the ground improvement for the VVIP Airport Project with PVD and CMC in Indonesia
Bangladesh | Nuclear Power Plant – DSM
tazkiyachaerani2025-05-08T14:42:31+07:00Deep Soil Mixing project in Bangladesh for a Nuclear Power Plant in Ruppur.
Indonesia | Kiantar Airport, Poto Tano
tazkiyachaerani2025-05-08T14:55:44+07:00Menard reinforced the soft soils beneath the runway extension at Rendani Airport in Indonesia with Controlled Modulus Column (KGM) to improve stability and support for aircraft loads.
Malaysia | Sepang Circuit
tazkiyachaerani2025-05-08T14:43:02+07:00Menard Asia completed the ground improvement using Prefabricated Vertical Drain (PVD) for the Driving Experience Center at Sepang Circuit, Selangor, Malaysia, ensuring stable construction on soft ground.
Malaysia | Cameron Highland
tazkiyachaerani2025-05-08T14:44:47+07:00Menard Asia has completed a ground improvement project in Ringlet, Cameron Highlands. The project addressed the soft ground condition, which was anticipated due to the area's history as a former sediment dump from the adjacent site.
Vietnam | SOFE Phase 1
tazkiyachaerani2025-05-08T14:44:42+07:00Menard proposed a solution using Soil Mixing to ensure the stability of the platform during the temporary and final stage of the construction of the quay.